Properties: high strength and high temperature resistance
Application: applied to continuous working temperature up to 175oC
The occasion to fill the gap to 0.15mm in the following 5 points
Clock Neichu curing
Viscosity: 400/600
Cure time: 5 minutes /24 hours
Shear strength: 3625
Relative density: 1.13
instructions:
1 surface treatment: derusting, degreasing, cleaning and drying
Rust can be mechanical or chemical methods: degreasing, cleaning and using appropriate organic solvent (such as acetone solution
For two to three times to soak in.
2 apply anaerobic adhesive: apply adequate amount of anaerobic adhesive to fill the gap.
3 assembly: should be positioned as soon as possible, after positioning can not move the workpiece
4 curing: general 1 hours anaerobic adhesive can achieve the use of strength, 24 hours to reach the maximum strength.